3/26/12:
Today, we added a steel brace to the door frame and connected it to the existing walls. Only one more panel to go! While installing the bolts that connect the wall panels, we routed out the sides so that the door can fit flush against the frame. For our current donors, we sent out all of our cards today so expect a little "Thank You" in the mail soon.
See you next time!
Just the girls
3-24
The three girls of the studio came in Saturday to close the door gap to make it closer to the right dimension. Using the crane and winches, the gap for the door moved from the almost twelve feet gap, to the 8 foot gap that it is suppose to be. The door pieces will be put together and then put into place on Monday. This is the last work day of the spring break. We also got quotes for our ilevel beams, giving us a better idea of how much construction costs in just materials.